Original DEM
Excavated swale
1-m deep, 100-m wide
Excavated swale
2
-m deep, 100-m wide
Drainage enforcement
:
•
E
ncourage flow toward preferred courses.
•
Degree of encouragement determined by
depth and width of excavated swale.
•
Once flow directions set, swale is removed
and all analyses done on original DEM.